DRAG DROP
You have an Exchange Server organization that contains three servers. The servers are configured as shown in the following table.
You need to create a new database availability group (DAG) that contains EX1 and EX2.
Which three actions should you perform in sequence? (To answer, move the appropriate three actions from the list of actions to the answer area and arrange them in the correct order.)
You need to recommend a high-availability deployment strategy for the mailbox servers. The solution must ensure site resiliency.
What is the best recommendation to achieve the goal? More than one answer choice may achieve the goal. Select the BEST answer.
Your company has two data centers named Main1 and Main2. Each data center connects directly to the Internet and has a link to the other data center. All servers run Windows Server 2012 R2.
The network contains an Active Directory forest. Each data center is configured as an Active Directory site.
You plan to deploy two Exchange Server 2013 servers to each data center. Each data center will host 500 user mailboxes for its respective users. All of the users will connect remotely to access their mailbox.
You need to recommend a deployment solution that meets the following requirements:
The users from both data centers must be able to access their mailbox if the link between the data centers fails.
The users from both data centers must be able to access their mailbox if a single server fails.
The solution must minimize manual intervention if a site fails.
What is the best recommendation to achieve the goal? More than one answer choice may achieve the goal. Select the BEST answer.
HOTSPOT
Your network contains two Active Directory sites named MainSite and DRSite.
You have an Exchange Server 2013 organization that contains two servers. The servers are configured as shown in the following table.
The active copy of DB1 is located on EX1. There are typically 100 MB of log files queued on EX1.
You need to recommend a procedure to allow administrators to mount the mailbox database copies on EX2 if EX1 fails. The recovery point objective (RPO) for mailbox data is 200 MB.
Which command should you recommend running? (To answer, select the appropriate options in the answer area.)