Question 16

Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operatorhas completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.
  • Question 17

    To reduce the subassembly stock with no impact on material planning of child components of the subassemblies stock, you need to modify the multilevel item structure of a product.
    Identify the action that meets this requirement.
  • Question 18

    TheManufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day andNight Shift.
    Identify the correct sequence of steps to achieve this requirement.
  • Question 19

    In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an assembly have been defined as required.
    A cost accountant created different scenarios to represent different manufacturing and cost assumptions and compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the cost scenario to cost accounting.
    Identify three process steps that the cost accountant has to perform to transferthe assembly to cost accounting in frozen type.
  • Question 20

    A Production Operator needs to load Work Order Transactions from an external system into Manufacturing Cloud.
    Identify the correct sequence of tasks to be performed.