Online Access Free 1z1-076 Practice Test
Exam Code: | 1z1-076 |
Exam Name: | Oracle Database 19c: Data Guard Administration |
Certification Provider: | Oracle |
Free Question Number: | 111 |
Posted: | Sep 09, 2025 |
Your expertise is requested for these customer requirements:
The Data Guard environment must be in maximum protection mode.
Reports must be offloaded to a physical standby database.
There must be no lag between the primary and standby databases that affect the reports produced.
The primary database must be resilient in case of a single network failure.
Which solution is correct for these requirements?
Which three actions are performed by the START PLAN procedure of the DBMS ROLLING package?
Which two are true concerning the configuring of Flashback database in a Data Guard environment?
Suppose that you manage the following databases in your environment:
* boston: Primary database with a single PDB called DEVI
* london: Physical standby database protecting the PDB called DEVI
* orcl: Stand-alone database with a single PDB called PDB1 as a remote clone source You are planning to run the following command to create a remote clone in the primary database (boston) using pdbi in orcl:
Which are the THREE prerequisites for automating instantiation of the PDB in the standby database (london)?