Question 81
An administrator is preparing for a deployment of a new vCenter Server Appliance. The following information has been provided to complete the deployment:
*ESXi Host name (FQDN): esxOl.corp local . ESXi IP Address: 172.20.10.200
*vCenter Server Name (FQDN): vcsa01 corp.local
*vCenter Server IP Address: 172.20 10.100
*NTP Server: 172.20.10.20
*DNS Server: 172.20.10.1
*Deployment Size: Tiny
*Storage Size: Default
Which two actions must the administrator complete before starting the installation of the vCenter Server Appliance? (Choose two.)
*ESXi Host name (FQDN): esxOl.corp local . ESXi IP Address: 172.20.10.200
*vCenter Server Name (FQDN): vcsa01 corp.local
*vCenter Server IP Address: 172.20 10.100
*NTP Server: 172.20.10.20
*DNS Server: 172.20.10.1
*Deployment Size: Tiny
*Storage Size: Default
Which two actions must the administrator complete before starting the installation of the vCenter Server Appliance? (Choose two.)
Question 82
During the staging of a patch on a vCenter Server Appliance, an error was encountered and the process stopped. An administrator resolved the root cause and is ready to continue with the staging of the patch.
From the vCenter Management Interface, which action should the administrator take to continue the process from the point at which the error occurred?
From the vCenter Management Interface, which action should the administrator take to continue the process from the point at which the error occurred?
Question 83
An administrator needs to configure a content library solution based on the following information:
* A new corporate virtual machine (VM) template is created every month to include all of the latest patches.
* The new VM template should be downloaded from the primary data center site (London) to two secondary data center sites (Tokyo and New York) as soon as possible.
* There is limited disk space available at one of the secondary data center sites (Tokyo) due to an ongoing data center consolidation project.
Which four steps should the administrator take to configure the content library solution before adding a VM template? (Choose four.)
* A new corporate virtual machine (VM) template is created every month to include all of the latest patches.
* The new VM template should be downloaded from the primary data center site (London) to two secondary data center sites (Tokyo and New York) as soon as possible.
* There is limited disk space available at one of the secondary data center sites (Tokyo) due to an ongoing data center consolidation project.
Which four steps should the administrator take to configure the content library solution before adding a VM template? (Choose four.)
Question 84
An administrator wants to use tag-based placement rules on their virtual machine disks using VMware vCenter.
Which option would allow the administrator to achieve this?
Which option would allow the administrator to achieve this?
Question 85
An administrator needs to update a VMware vCenter instance to a newer minor release version. Due to restrictions within the environment, the vCenter instance does not have access to the Internet As a first step, the administrator downloads the required update on another machine.
What are the next steps the administrator must perform to complete the update?
A Place the update ISO file in a Virtual Machine File System (VMFS) datastore.
' Use the vSphere Client to select the update ISO file as the source for the update.
What are the next steps the administrator must perform to complete the update?
A Place the update ISO file in a Virtual Machine File System (VMFS) datastore.
' Use the vSphere Client to select the update ISO file as the source for the update.
