Question 66
An architect is designing a new greenfield environment with 600 ESXi hosts in an automated fashion. The engineering department already has a PXE Boot server, TFTP server, and DHCP server set up with an NFS mount for their current Linux servers.
The architect must be able to demonstrate and meet a security requirement to have all infrastructure processes separated.
Which recommendation should the architect make for the ESXi host deployment?
The architect must be able to demonstrate and meet a security requirement to have all infrastructure processes separated.
Which recommendation should the architect make for the ESXi host deployment?
Question 67
An architect is finalizing the design for a new vSphere platform based on the following information:
- All Windows virtual machines will be hosted on a dedicated cluster for licensing purposes.
- All Linux virtual machines will be hosted on a dedicated cluster for licensing purposes.
- All management virtual machines will be hosted on a dedicated cluster.
- A total of ten physical sites will be used to host virtual machines.
- In the event of one physical datacenter becoming unavailable, the manageability of the virtual infrastructure in the remaining data centers should not be impacted.
- Access to configure the management virtual machines via vCenter Server must be controlled through the management Active Directory domain.
- Access to configure the Windows and Linux virtual machines must be controlled through the resource Active Directory domain.
- The management and resource Active Directory domains are part of separate Active Directory forests and do not have any trusts between them.
- The design will use Active Directory with Integrated Windows Authentication.
How should the architect document the vCenter Server configuration for this design?
- All Windows virtual machines will be hosted on a dedicated cluster for licensing purposes.
- All Linux virtual machines will be hosted on a dedicated cluster for licensing purposes.
- All management virtual machines will be hosted on a dedicated cluster.
- A total of ten physical sites will be used to host virtual machines.
- In the event of one physical datacenter becoming unavailable, the manageability of the virtual infrastructure in the remaining data centers should not be impacted.
- Access to configure the management virtual machines via vCenter Server must be controlled through the management Active Directory domain.
- Access to configure the Windows and Linux virtual machines must be controlled through the resource Active Directory domain.
- The management and resource Active Directory domains are part of separate Active Directory forests and do not have any trusts between them.
- The design will use Active Directory with Integrated Windows Authentication.
How should the architect document the vCenter Server configuration for this design?
Question 68
Which of the following is a functional requirement?
Question 69
An architect is designing a new vSphere environment to meet the following requirements:
- REQ01 The platform must provide a minimum of N+1 redundancy.
- REQ02 The recovery point objective (RPO) for all virtual machines within the environment is one hour.
- REQ03 The production environment must be deployed into the primary data center.
- REQ04 The design must adhere to the company security standards, which include Payment Card Industry (PCI) Data Security Standard compliance.
- REQ05 The platform must be capable of running 1,000 virtual machines across both data centers concurrently.
Which two of the listed requirements would be classified as functional requirements? (Choose two.)
- REQ01 The platform must provide a minimum of N+1 redundancy.
- REQ02 The recovery point objective (RPO) for all virtual machines within the environment is one hour.
- REQ03 The production environment must be deployed into the primary data center.
- REQ04 The design must adhere to the company security standards, which include Payment Card Industry (PCI) Data Security Standard compliance.
- REQ05 The platform must be capable of running 1,000 virtual machines across both data centers concurrently.
Which two of the listed requirements would be classified as functional requirements? (Choose two.)
Question 70
An architect is designing a new platform. Existing virtual machines will be migrated to this platform.
The migration process is defined as follows:
- A migration host will be loaded with virtual machines from the old platform.
- The migration host will be added to the desired new cluster.
- Virtual machines compute and storage will be migrated to desired hosts in the new platform.
- The migration host will be removed and added back to the old platform so the process can restart.
The following characteristics are noted:
- A total of 800 virtual machines will be migrated.
- A total of 50 hosts will be available in the new platform.
- The migration host will have four paths to each of 512 connected LUNs.
Which size vCenter Server should be specified for the new platform?
The migration process is defined as follows:
- A migration host will be loaded with virtual machines from the old platform.
- The migration host will be added to the desired new cluster.
- Virtual machines compute and storage will be migrated to desired hosts in the new platform.
- The migration host will be removed and added back to the old platform so the process can restart.
The following characteristics are noted:
- A total of 800 virtual machines will be migrated.
- A total of 50 hosts will be available in the new platform.
- The migration host will have four paths to each of 512 connected LUNs.
Which size vCenter Server should be specified for the new platform?
Premium Bundle
Newest 3V0-21.23 Exam PDF Dumps shared by BraindumpsPass.com for Helping Passing 3V0-21.23 Exam! BraindumpsPass.com now offer the updated 3V0-21.23 exam dumps, the BraindumpsPass.com 3V0-21.23 exam questions have been updated and answers have been corrected get the latest BraindumpsPass.com 3V0-21.23 pdf dumps with Exam Engine here:
