Online Access Free 7003-1 Practice Test
| Exam Code: | 7003-1 |
| Exam Name: | Avaya Communication Server 1000 for Avaya Aura Implementation Exam |
| Certification Provider: | Avaya |
| Free Question Number: | 65 |
| Posted: | May 29, 2026 |
Click the Exhibit button.
A technician is asked to review the existing route information for the customer.
According to the printout shown in the exhibit, type of route is this?
A customer with a Communication Server (CS) 1000E 5.5 HA system with IPMG systems and dual ISP 1100 signaling Servers is upgrading their system to release 7x. The ISP 100 Signaling Servers are being replaced with CPDC servers. The contents of the upgrade kit have been installed and the maintenance terminal connection has been established.
What are three other upgrades tasks to be completed? (Choose three)
A technician is installing the Linux Base Operating System software on the CPDC server for the Avaya Aura system and steps away while the software is loading. When the technician returns, he verifies that the Linux base installation is complete and successfully installed.
What status can the technician verify to ensure the installation is successful?
A customer wants to build a new Ip node on their Communication Server (CS) 1000E system with three Signaling Servers. This node will support virtual trunks, IP media services, TPS and personnel directories. A technician logs into Elements manager to complete the configuration, after creating and saving the node configuration, the transfer now option chosen, then the servers are selected, the start sync is selected followed by restart application.
What is expected outcome from the system?