Question 6

Assume that Task 1 is configured to run at 02:00 each day. In this case, the scheduling system automatically generates a snapshot at the time predefined by the periodic node task at 23:30 each day.
That is, the instance of Task 1 will run at 02:00 the next day. If the system detects the upstream task is complete, the system automatically runs the Task 1 instance at 02:00 the next day.
Score 1
  • Question 7

    MaxCompute Tunnel provides high concurrency data upload and download services. User can use the Tunnel service to upload or download the data to MaxCompute. Which of the following descriptions about Tunnel is NOT correct:
    Score 2
  • Question 8

    Which of the following Hadoop ecosystem componets can you choose to setup a streaming log analysis system?(Number of correct answers: 3) Score 2
  • Question 9

    DataV is a powerful yet accessible data visualization tool, which features geographic information systems allowing for rapid interpretation of data to understand relationships, patterns, and trends. When a DataV screen is ready, it can embed works to the existing portal of the enterprise through ______.
  • Question 10

    Synchronous development in DataWorks provides both wizard and script modes.
    Score 1