Question 121

You are evaluating which migration method Litware can implement based on the current environment and the business goals.
Which migration method will cause the least amount of downtime?
  • Question 122

    You plan to migrate an SAP ERP Central Component (SAP ECC) production system to Azure.
    You are reviewing the SAP EarlyWatch Alert report for the system.
    You need to recommend sizes for the Azure virtual machines that will host the system.
    Which two sections of the report should you review? Each correct answer presents a complete solution.
    NOTE: Each correct selection is worth one point.
  • Question 123

    You are planning the Azure network infrastructure to support the disaster recovery requirements.
    What is the minimum number of virtual networks required for the SAP deployment?
  • Question 124

    You have an on-premises SAP environment.
    Backups are performed by using tape backups. There are SO TB of backups.
    A Windows file server has BMP images of checks used by SAP Finance. There are 9 IB of images.
    You need to recommend a method to migrate the images and the tape backups to Azure. The solution must maintain continuous replication of the images.
    What should you include in the recommendation? To answer, select the appropriate options in the answer area.
    NOTE: Each correct selection is worth one point.

    Question 125

    You have an SAP environment on Azure that uses multiple subscriptions.
    To meet GDPR requirements, you need to ensure that virtual machines are deployed only to the West Europe and North Europe Azure regions.
    Which Azure components should you use?