Question 16
You plan to implement a deployment of SAP NetWeaver on Azure. The deployment will be hosted on virtual machines that run a custom Windows Server 2022 Datacenter image.
You need to configure the virtual machines to support Secure Boot.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

You need to configure the virtual machines to support Secure Boot.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Question 17
You are designing the backup for an SAP database.
You have an Azure Storage account that is configured as shown in the following exhibit.

Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.

You have an Azure Storage account that is configured as shown in the following exhibit.

Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.

Question 18
You have an SAP on Azure production landscape that contains an SAP HANA database. You create a backup policy as shown in the following exhibit.

Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic. NOTE: Each correct selection is worth one point.


Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic. NOTE: Each correct selection is worth one point.

Question 19
You plan to migrate an SAP ERP Central Component (SAP ECC) production system to Azure.
You are reviewing the SAP EarlyWatch Alert report for the system.
You need to recommend sizes for the Azure virtual machines that will host the system.
Which two sections of the report should you review? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
You are reviewing the SAP EarlyWatch Alert report for the system.
You need to recommend sizes for the Azure virtual machines that will host the system.
Which two sections of the report should you review? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
Question 20
You are designing an SAP HANA deployment.
You estimate that the database will be 1.8 TB in three years.
You need to ensure that the deployment supports 60,000 IOPS. The solution must minimize costs and provide the lowest latency possible.
Which type of disk should you use?
You estimate that the database will be 1.8 TB in three years.
You need to ensure that the deployment supports 60,000 IOPS. The solution must minimize costs and provide the lowest latency possible.
Which type of disk should you use?
Premium Bundle
Newest AZ-120 Exam PDF Dumps shared by BraindumpsPass.com for Helping Passing AZ-120 Exam! BraindumpsPass.com now offer the updated AZ-120 exam dumps, the BraindumpsPass.com AZ-120 exam questions have been updated and answers have been corrected get the latest BraindumpsPass.com AZ-120 pdf dumps with Exam Engine here: