Question 11

The BIM manager receives an external lighting CAD file to link into the Architectural model and realizes the link is not vertically or horizontally aligned.
What fix needs to happen to resolve this misalignment?
  • Question 12

    A museum project anticipating generative iterations is being designed by a team working across multiple time zones under a tight schedule. The client hosts weekly meetings to review various facade options, document sustainability goals, and evaluate numerous energy analyses.
    What project-specific training should the design technology team provide to prepare the team for client meetings and ensure successful project execution?
  • Question 13

    Refer to the exhibit.

    A designer cannot see a 2x4 tile ceiling in the hallway area of their Reflected Ceiling Plan, but that same ceiling is visible in a 3D view. The 2x2 ceilings in the other rooms are visible in both views.
    What are two possible reasons for this? (Select two.)
  • Question 14

    During a model review, several linked files appear missing or unloadable in the federated coordination file. The files were present and working the day before, and no changes were made to the Revit host model itself.
    As the BIM manager, what is the most appropriate step to troubleshoot the issue?
  • Question 15

    A new project being set up requires consistency across all floor plans. However, because of variations in floor-to-floor heights, the project team needs a different View Range for each level.
    What is the most efficient way to accommodate this?