Question 11
Which material master setting is required to use the repetitive planning table for production with production orders?
Question 12
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?
Question 13
What is the first step in the MRP run?
Question 14
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer.
Question 15
How Is the bill of material (BOM) exploded when you use a BOM explosion number?