Online Access Free C8060-218 Practice Test
| Exam Code: | C8060-218 |
| Exam Name: | IBM Sterling B2B Integrator V5.2, Solution Implementation |
| Certification Provider: | IBM |
| Free Question Number: | 104 |
| Posted: | May 24, 2026 |
A company has installed a larger drive on their IBM Sterling B2B Integrator (SBI) server and want to change the location of their archived data to this new drive. Where is the default directory forarchive data set?
For increased availability reasons, a two-node application cluster has two servers in the DMZ. Each DMZ server has two network adapters. The system needs to be enabled to accept inbound FTP or FTP SSL client connections on port 25000 and 26000. Awildcard (*) is not used in the Perimeter Server. How many FTP Server adapters need to be configured to support ACTIVE and PASSIVE user initiated sessions?
The system default for the amount of time a Business Process (BP) remains online in the system is set to five days. How can thatvalue be overridden?
A developer is creating an IBM Sterling B2B Integrator (SBI) BusinessProcess (BP) using the Graphical Process Modeler (GPM). A Mailbox Delete service is being used to delete a
specific message from a mailbox. The developer is assigning the parameter MessageId to delete in the name-value pair in the Service Editor. There areother services being used in the BP that create the XML tag MessageId in Process Data. Which message mode in the GPM Service Editor will be required to ensure that the value of MessageId set in the Service Editor will be used?