Question 601
At which of the basic phases of the System Development Life Cycle are security requirements formalized?
Correct Answer: D
During the Functional Requirements Definition the project management and systems development teams will conduct a comprehensive analysis of current and possible future functional requirements to ensure that the new system will meet end-user needs.
The teams also review the documents from the project initiation phase and make any revisions or updates as needed. For smaller projects, this phase is often subsumed in the project initiation phase. At this point security requirements should be formalized.
The Development Life Cycle is a project management tool that can be used to plan, execute, and control a software development project usually called the Systems
Development Life Cycle (SDLC).
The SDLC is a process that includes systems analysts, software engineers, programmers, and end users in the project design and development. Because there is no industry-wide
SDLC, an organization can use any one, or a combination of SDLC methods.
The SDLC simply provides a framework for the phases of a software development project from defining the functional requirements to implementation. Regardless of the method used, the SDLC outlines the essential phases, which can be shown together or as separate elements. The model chosen should be based on the project.
For example, some models work better with long-term, complex projects, while others are more suited for short-term projects. The key element is that a formalized SDLC is utilized.
The number of phases can range from three basic phases (concept, design, and implement) on up.
The basic phases of SDLC are:
Project initiation and planning
Functional requirements definition
System design specifications
Development and implementation
Documentation and common program controls
Testing and evaluation control, (certification and accreditation)
Transition to production (implementation)
The system life cycle (SLC) extends beyond the SDLC to include two additional phases:
Operations and maintenance support (post-installation)
Revisions and system replacement
System Design Specifications
This phase includes all activities related to designing the system and software. In this phase, the system architecture, system outputs, and system interfaces are designed. Data input, data flow, and output requirements are established and security features are designed, generally based on the overall security architecture for the company.
Development and Implementation
During this phase, the source code is generated, test scenarios and test cases are developed, unit and integration testing is conducted, and the program and system are documented for maintenance and for turnover to acceptance testing and production. As well as general care for software quality, reliability, and consistency of operation, particular care should be taken to ensure that the code is analyzed to eliminate common vulnerabilities that might lead to security exploits and other risks.
Documentation and Common Program Controls
These are controls used when editing the data within the program, the types of logging the program should be doing, and how the program versions should be stored. A large number of such controls may be needed, see the reference below for a full list of controls.
Acceptance
In the acceptance phase, preferably an independent group develops test data and tests the code to ensure that it will function within the organization's environment and that it meets all the functional and security requirements. It is essential that an independent group test the code during all applicable stages of development to prevent a separation of duties issue. The goal of security testing is to ensure that the application meets its security requirements and specifications. The security testing should uncover all design and implementation flaws that would allow a user to violate the software security policy and requirements. To ensure test validity, the application should be tested in an environment that simulates the production environment. This should include a security certification package and any user documentation.
Certification and Accreditation (Security Authorization)
Certification is the process of evaluating the security stance of the software or system against a predetermined set of security standards or policies. Certification also examines how well the system performs its intended functional requirements. The certification or evaluation document should contain an analysis of the technical and nontechnical security features and countermeasures and the extent to which the software or system meets the security requirements for its mission and operational environment.
Transition to Production (Implementation)
During this phase, the new system is transitioned from the acceptance phase into the live production environment. Activities during this phase include obtaining security accreditation; training the new users according to the implementation and training schedules; implementing the system, including installation and data conversions; and, if necessary, conducting any parallel operations.
Revisions and System Replacement
As systems are in production mode, the hardware and software baselines should be subject to periodic evaluations and audits. In some instances, problems with the application may not be defects or flaws, but rather additional functions not currently developed in the application. Any changes to the application must follow the same SDLC and be recorded in a change management system. Revision reviews should include security planning and procedures to avoid future problems. Periodic application audits should be conducted and include documenting security incidents when problems occur. Documenting system failures is a valuable resource for justifying future system enhancements.
Below you have the phases used by NIST in it's 800-63 Revision 2 document
As noted above, the phases will vary from one document to another one. For the purpose of the exam use the list provided in the official ISC2 Study book which is presented in short form above. Refer to the book for a more detailed description of activities at each of the phases of the SDLC.
However, all references have very similar steps being used. As mentioned in the official book, it could be as simple as three phases in it's most basic version (concept, design, and implement) or a lot more in more detailed versions of the SDLC.
The key thing is to make use of an SDLC.
SDLC phases
Reference(s) used for this question:
NIST SP 800-64 Revision 2 at http://csrc.nist.gov/publications/nistpubs/800-64-
Rev2/SP800-64-Revision2.pdf
and
Schneiter, Andrew (2013-04-15). Official (ISC)2 Guide to the CISSP CBK, Third Edition:
Software Development Security ((ISC)2 Press) (Kindle Locations 134-157). Auerbach
Publications. Kindle Edition.
The teams also review the documents from the project initiation phase and make any revisions or updates as needed. For smaller projects, this phase is often subsumed in the project initiation phase. At this point security requirements should be formalized.
The Development Life Cycle is a project management tool that can be used to plan, execute, and control a software development project usually called the Systems
Development Life Cycle (SDLC).
The SDLC is a process that includes systems analysts, software engineers, programmers, and end users in the project design and development. Because there is no industry-wide
SDLC, an organization can use any one, or a combination of SDLC methods.
The SDLC simply provides a framework for the phases of a software development project from defining the functional requirements to implementation. Regardless of the method used, the SDLC outlines the essential phases, which can be shown together or as separate elements. The model chosen should be based on the project.
For example, some models work better with long-term, complex projects, while others are more suited for short-term projects. The key element is that a formalized SDLC is utilized.
The number of phases can range from three basic phases (concept, design, and implement) on up.
The basic phases of SDLC are:
Project initiation and planning
Functional requirements definition
System design specifications
Development and implementation
Documentation and common program controls
Testing and evaluation control, (certification and accreditation)
Transition to production (implementation)
The system life cycle (SLC) extends beyond the SDLC to include two additional phases:
Operations and maintenance support (post-installation)
Revisions and system replacement
System Design Specifications
This phase includes all activities related to designing the system and software. In this phase, the system architecture, system outputs, and system interfaces are designed. Data input, data flow, and output requirements are established and security features are designed, generally based on the overall security architecture for the company.
Development and Implementation
During this phase, the source code is generated, test scenarios and test cases are developed, unit and integration testing is conducted, and the program and system are documented for maintenance and for turnover to acceptance testing and production. As well as general care for software quality, reliability, and consistency of operation, particular care should be taken to ensure that the code is analyzed to eliminate common vulnerabilities that might lead to security exploits and other risks.
Documentation and Common Program Controls
These are controls used when editing the data within the program, the types of logging the program should be doing, and how the program versions should be stored. A large number of such controls may be needed, see the reference below for a full list of controls.
Acceptance
In the acceptance phase, preferably an independent group develops test data and tests the code to ensure that it will function within the organization's environment and that it meets all the functional and security requirements. It is essential that an independent group test the code during all applicable stages of development to prevent a separation of duties issue. The goal of security testing is to ensure that the application meets its security requirements and specifications. The security testing should uncover all design and implementation flaws that would allow a user to violate the software security policy and requirements. To ensure test validity, the application should be tested in an environment that simulates the production environment. This should include a security certification package and any user documentation.
Certification and Accreditation (Security Authorization)
Certification is the process of evaluating the security stance of the software or system against a predetermined set of security standards or policies. Certification also examines how well the system performs its intended functional requirements. The certification or evaluation document should contain an analysis of the technical and nontechnical security features and countermeasures and the extent to which the software or system meets the security requirements for its mission and operational environment.
Transition to Production (Implementation)
During this phase, the new system is transitioned from the acceptance phase into the live production environment. Activities during this phase include obtaining security accreditation; training the new users according to the implementation and training schedules; implementing the system, including installation and data conversions; and, if necessary, conducting any parallel operations.
Revisions and System Replacement
As systems are in production mode, the hardware and software baselines should be subject to periodic evaluations and audits. In some instances, problems with the application may not be defects or flaws, but rather additional functions not currently developed in the application. Any changes to the application must follow the same SDLC and be recorded in a change management system. Revision reviews should include security planning and procedures to avoid future problems. Periodic application audits should be conducted and include documenting security incidents when problems occur. Documenting system failures is a valuable resource for justifying future system enhancements.
Below you have the phases used by NIST in it's 800-63 Revision 2 document
As noted above, the phases will vary from one document to another one. For the purpose of the exam use the list provided in the official ISC2 Study book which is presented in short form above. Refer to the book for a more detailed description of activities at each of the phases of the SDLC.
However, all references have very similar steps being used. As mentioned in the official book, it could be as simple as three phases in it's most basic version (concept, design, and implement) or a lot more in more detailed versions of the SDLC.
The key thing is to make use of an SDLC.
SDLC phases
Reference(s) used for this question:
NIST SP 800-64 Revision 2 at http://csrc.nist.gov/publications/nistpubs/800-64-
Rev2/SP800-64-Revision2.pdf
and
Schneiter, Andrew (2013-04-15). Official (ISC)2 Guide to the CISSP CBK, Third Edition:
Software Development Security ((ISC)2 Press) (Kindle Locations 134-157). Auerbach
Publications. Kindle Edition.
Question 602
Which one of the following is generally NOT considered a covered
entity under Title II, Administrative Simplification, of the HIPAA law?
entity under Title II, Administrative Simplification, of the HIPAA law?
Correct Answer: A
Employers are not specifically covered under HIPAa. HIPAA applies to health care providers that transmit health care information in electronic form, health care clearinghouses, and health plans. However, some employers may be covered under the Gramm-Leach-Bliley Act. The Gramm-Leach-Bliley (GLB) Act was enacted on November 12, 1999, to remove Depression era restrictions on banks that limited certain business activities, mergers, and affiliations. It repeals the restrictions on banks affiliating with securities firms contained in sections 20 and 32 of the Glass-Steagall Act. GLB became effective on November 13, 2001. GLB also requires health plans and insurers to protect member and subscriber data in electronic and other formats. These health plans and insurers will fall under new state laws and regulations that are being passed to implement GLB, since GLB explicitly assigns enforcement of the health plan and insurer regulations to state insurance authorities (15 USc. B6805). Some of the privacy and security requirements of Gramm-Leach-Bliley are similar to those of HIPAA. Most states required that health plans and insurers comply with the GLB requirements by July 1, 2001, and financial institutions were required to be in full compliance with Gramm-Leach-Bliley by this date. The other answers are incorrect since they are covered by the HIPAAregulations.
Question 603
Which security model introduces access to objects only through programs?
Correct Answer: C
In the Clark-Wilson model, the subject no longer has direct access to objects but
instead must access them through programs (well -formed transactions).
The Clark-Wilson integrity model provides a foundation for specifying and analyzing an integrity
policy for a computing system.
The model is primarily concerned with formalizing the notion of information integrity. Information
integrity is maintained by preventing corruption of data items in a system due to either error or
malicious intent. An integrity policy describes how the data items in the system should be kept
valid from one state of the system to the next and specifies the capabilities of various principals in
the system. The model defines enforcement rules and certification rules.
Clark-Wilson is more clearly applicable to business and industry processes in which the integrity
of the information content is paramount at any level of classification.
Integrity goals of Clark-Wilson model:
Prevent unauthorized users from making modification (Only this one is addressed by the Biba
model).
Separation of duties prevents authorized users from making improper modifications.
Well formed transactions: maintain internal and external consistency i.e. it is a series of operations
that are carried out to transfer the data from one consistent state to the other.
The following are incorrect answers:
The Biba model is incorrect. The Biba model is concerned with integrity and controls access to
objects based on a comparison of the security level of the subject to that of the object.
The Bell-LaPdaula model is incorrect. The Bell-LaPaula model is concerned with confidentiality
and controls access to objects based on a comparison of the clearence level of the subject to the
classification level of the object.
The information flow model is incorrect. The information flow model uses a lattice where objects
are labelled with security classes and information can flow either upward or at the same level. It is
similar in framework to the Bell-LaPadula model.
References:
ISC2 Official Study Guide, Pages 325 - 327
AIO3, pp. 284 - 287
AIOv4 Security Architecture and Design (pages 338 - 342)
AIOv5 Security Architecture and Design (pages 341 - 344)
Wikipedia at: https://en.wikipedia.org/wiki/Clark-Wilson_model
instead must access them through programs (well -formed transactions).
The Clark-Wilson integrity model provides a foundation for specifying and analyzing an integrity
policy for a computing system.
The model is primarily concerned with formalizing the notion of information integrity. Information
integrity is maintained by preventing corruption of data items in a system due to either error or
malicious intent. An integrity policy describes how the data items in the system should be kept
valid from one state of the system to the next and specifies the capabilities of various principals in
the system. The model defines enforcement rules and certification rules.
Clark-Wilson is more clearly applicable to business and industry processes in which the integrity
of the information content is paramount at any level of classification.
Integrity goals of Clark-Wilson model:
Prevent unauthorized users from making modification (Only this one is addressed by the Biba
model).
Separation of duties prevents authorized users from making improper modifications.
Well formed transactions: maintain internal and external consistency i.e. it is a series of operations
that are carried out to transfer the data from one consistent state to the other.
The following are incorrect answers:
The Biba model is incorrect. The Biba model is concerned with integrity and controls access to
objects based on a comparison of the security level of the subject to that of the object.
The Bell-LaPdaula model is incorrect. The Bell-LaPaula model is concerned with confidentiality
and controls access to objects based on a comparison of the clearence level of the subject to the
classification level of the object.
The information flow model is incorrect. The information flow model uses a lattice where objects
are labelled with security classes and information can flow either upward or at the same level. It is
similar in framework to the Bell-LaPadula model.
References:
ISC2 Official Study Guide, Pages 325 - 327
AIO3, pp. 284 - 287
AIOv4 Security Architecture and Design (pages 338 - 342)
AIOv5 Security Architecture and Design (pages 341 - 344)
Wikipedia at: https://en.wikipedia.org/wiki/Clark-Wilson_model
Question 604
The Internet can be utilized by either?
Correct Answer: D
Question 605
Match the access control type to the example of the control type.
Drag each access control type net to its corresponding example.

Drag each access control type net to its corresponding example.

Correct Answer:

Explanation
Administrative - labeling of sensitive data
Technical - Constrained user interface
Logical - Biometrics for authentication
Physical - Radio Frequency Identification 9RFID) badge
- Other Version
- 3759ISC.CISSP.v2026-05-25.q539
- 2542ISC.CISSP.v2026-04-20.q414
- 12095ISC.CISSP.v2024-12-05.q999
- 11018ISC.CISSP.v2024-09-21.q999
- 10859ISC.CISSP.v2023-07-03.q999
- 3496ISC.CISSP.v2023-04-20.q206
- 7993ISC.CISSP.v2022-09-06.q331
- 8854ISC.CISSP.v2022-08-27.q376
- 145ISC.Fast2test.CISSP.v2021-12-03.by.osborn.827q.pdf
- 24517ISC.CISSP.v2021-10-01.q353
- Latest Upload
- 156PaloAltoNetworks.SSE-Engineer.v2026-10-17.q44
- 260Cisco.300-420.v2026-10-17.q324
- 199Salesforce.MCE-Con-201.v2026-10-15.q108
- 180EMC.NCA.v2026-10-15.q25
- 280Apple.Apple-Device-Support.v2026-10-15.q159
- 186F5.F5CAB3.v2026-10-14.q47
- 187Oracle.1Z0-1048-25.v2026-10-14.q67
- 263Cisco.300-730.v2026-10-14.q199
- 258Salesforce.Sales-Admn-202.v2026-10-14.q160
- 174ServSafe.ServSafe-Manager.v2026-10-13.q32