Online Access Free CMMC-CCP Practice Test

Exam Code:CMMC-CCP
Exam Name:Certified CMMC Professional (CCP) Exam
Certification Provider:Cyber AB
Free Question Number:208
Posted:Sep 06, 2025
Rating
100%

Question 1

When are contractors required to achieve a CMMC certificate at the Level specified in the solicitation?

Question 2

A Lead Assessor is performing a CMMC readiness review. The Lead Assessor has already recorded the assessment risk status and the overall assessment feasibility. At MINIMUM, what remaining readiness review criteria should be verified?

Question 3

An assessment is being conducted at a remote client site. For the duration of the assessment, the client has provided a designated hoteling space in their secure facility which consists of a desk with access to a shared printer. After noticing that the desk does not lock, a locked cabinet is requested but the client does not have one available. At the end of the day, the client provides a printout copy of an important network diagram. The diagram is clearly marked and contains CUI. What should be done NEXT to protect the document?

Question 4

On a Level 2 Assessment Team, what are the roles of the CCP and the CCA?

Question 5

The facilities manager for a company has procured a Wi-Fi enabled, mobile application-controlled thermostat for the server room, citing concerns over the inability to remotely gauge and control the temperature of the room. Because the thermostat is connected to the company's FCI network, should it be assessed as part of the CMMC Level 1 Self-Assessment Scope?

Add Comments

Your email address will not be published. Required fields are marked *

insert code
Type the characters from the picture.