Question 57

Operating time to failure (hours) / # Assets/components run to failure
  • Question 58

    Which of the following is least likely to be linked to Maintenance and Reliability process improvements?
  • Question 59

    Measure of the variables inherent in the design that affect availability. In the calculation of downtime, it usually includes only active repair time. It does not include preventive maintenance time and administrative or logistic delays, but does include corrective maintenance downtime
  • Question 60

    (%) = [Corrective Work Identified as Rework (hours) ÷ Total Maintenance Labor Hours] ×
    100
  • Question 61

    As the maintenance manager for a manufacturing company, you have conducted a study that reveals the mechanics, on average, spend four hours per ten hour shift on wrench time (tool turning time). Your first action should be: