Question 121

MRP and CRP should form part of a/an?
  • Question 122

    As 1980 gave way to the 1990 the world continued to change, forcing additional changes in supply-chain concepts. All of the following statements depict those changes EXCEPT:
  • Question 123

    What is needed for items and is associated with master production scheduling?
  • Question 124

    Gather the information needed by the shop floor to make the product. Release orders to the shop floor as authorized by the material equipment plan. This is called dispatching. Production activity control will do such things in:
  • Question 125

    are determined by the computer's material requirement plan logic based upon the gross requirements for a particular part.