Online Access Free CTAL-TAE Practice Test
| Exam Code: | CTAL-TAE |
| Exam Name: | ISTQB Certified Tester Advanced Level, Test Automation Engineering |
| Certification Provider: | ISQI |
| Free Question Number: | 82 |
| Posted: | Jun 03, 2026 |
A TAS uses a commercial test automation tool and the default logs generated by the inconsistent formats such as different types of messages (pass/fail steps, screenshots, warnings, etc.) To solve this issue some custom logging functions have been created from the test scripts, making it possible to log the different types of messages with the same format. However, this may cause a problem due to excessive size of the logs which can make it difficult to find the required information. Assume that all the default logs will be disabled when running the automated tests and that some tests will not generate excessively sized logs.
Which of the following represents the BEST suggestion for implementing the custom logging functions?
A release candidate of a SUT, after being fully integrated with all other necessary systems, has successfully passed all required functional tests (90% were automated tests and 10% were manual tests). Now, it is necessary to perform reliability tests aimed at evaluating whether, under certain conditions, that release will be able to guarantee an MTBF (Mean Time Between Failures) in the production environment higher than a certain threshold (expressed in CPU time). Which of the following test environments is BEST suited to perform these reliability tests?
(Which of the following answers describes the LEAST relevant concern in selecting suitable test automation tools for a test automation project?)