Given the following figures for the testing on a project, and assuming the failure rate for initial tests remains constant and that all retests pass, what number of tests remain to be run? 3 credits
Which of the following is NOT a typical key challenge for testing in a RAD based development approach? 1 credit
Within the projects, a master test plan and phase test plan will be used. Following is a list of characteristics applicable for test plans:
a.Any deviation from the procedures described in the test
b.strategy document
c.The overall estimated costs, timescales and resource
d.requirements
e.A detailed schedule of testing activities
f.The development deliverables to be tested
g.Which test staff members (names) will be involved and when
h.Level of requirements coverage achieved
Which TWO of the above mentioned characteristics relate to the phase test plan? 1 credit
A test log is one of the documents that need to be produced in this domain in order to provide evidence of testing. However, the level of detail of test logs can vary. Which of the following is NOT an influencing factor for the level of detail of the test logs being produced? 1 credit