Question 66

What other details should be included in the following incident report when it is first submitted?
Date of Issue: 23/11/05
Severity: P1
Build: Version15.6
Details: Expected field to be limited to 15 chars, able to enter 27
  • Question 67

    Within the projects, a master test plan and phase test plan will be used. Following is a list of characteristics applicable for test plans:
    a.Any deviation from the procedures described in the test
    b.strategy document
    c.The overall estimated costs, timescales and resource
    d.requirements
    e.A detailed schedule of testing activities
    f.The development deliverables to be tested
    g.Which test staff members (names) will be involved and when
    h.Level of requirements coverage achieved
    Which TWO of the above mentioned characteristics relate to the phase test plan? 1 credit
  • Question 68

    In the MASPAR case study..?
  • Question 69

    What is the main reason for using a pilot project to introduce a testing tool into an organization?
  • Question 70

    Which of the following does NOT represent one of the three triggers for maintenance testing an operational system?