Question 211
A manufacturing company has the following DR requirements for its IaaS environment:
RPO of 24 hours
RTO of 8 hours
The company experiences a disaster and has a two-site hot/cold configuration. Which of the following is the BEST way for the company to recover?
RPO of 24 hours
RTO of 8 hours
The company experiences a disaster and has a two-site hot/cold configuration. Which of the following is the BEST way for the company to recover?
Question 212
A VM was deleted by mistake today at 11:05 a.m. Below are the backups currently available for the VM:

Crash-consistent restore is acceptable. Which of the following backups should be chosen?

Crash-consistent restore is acceptable. Which of the following backups should be chosen?
Question 213
Every night a datacenter takes snapshots of each VM and backs them up to a tape which is shipped off to a disaster recovery site once a week. Which of the following can mitigate a security breach if the tapes were to fall out of the shipping vehicle during transport?
Question 214
Below is the output from a troubleshooting activity:
1. SaaS application is unavailable to a set of users at a single site.
2. WAN connectivity was considered to be the cause of the problem.
3. Upon testing, it seemed the WAN connectivity was up, but the default gateway was unreachable from the internal users.
4. The faulty switch was replaced to bring up the connectivity.
5. The incident was documented.
Based on the methodology, which of the following steps was overlooked during the activity?
1. SaaS application is unavailable to a set of users at a single site.
2. WAN connectivity was considered to be the cause of the problem.
3. Upon testing, it seemed the WAN connectivity was up, but the default gateway was unreachable from the internal users.
4. The faulty switch was replaced to bring up the connectivity.
5. The incident was documented.
Based on the methodology, which of the following steps was overlooked during the activity?
Question 215
A multinational corporation needs to migrate servers, which are supporting a national defense project, to a new datacenter. The data in approx. imately 20GB in size. The engineer on the project is considering datacenters in several countries as possible destinations. All sites in consideration are on a high- speed MPLS network (10Gb+ connections). Which of the following environmental constraints is MOST likely to rule out a possible site as an option?