In the middle of the project, the client proposed an additional scope of work that requires a change order to the contract. Which statement applies to the contractor's percentage fee (i.e., mark-up) that should be added to the total amount in the change order?
Which of the following correctly indicates the information that must be provided on a site plan?
A civil engineering technologist is designing a sanitary collection system that is being constructed below the groundwater table. The owner requested that the system be pressure tested in order to minimize the infiltration into the collection system. Which of the following would be a major design consideration for the collection system?