Question 76
A Dell Technologies customer has multiple PowerProtect DD systems in a single Data Center. They must consolidate the systems into a single federated namespace so they can all be managed as a single entity.
Which feature can be configured so the customer does not have to manually reconfigure their backup software when a system is nearing full capacity?
Which feature can be configured so the customer does not have to manually reconfigure their backup software when a system is nearing full capacity?
Question 77
A backup administrator observes a linear increase in the PowerProtect DD Physical Capacity Used (PostCompression) graph. Weekly garbage collection tasks are not freeing space.
Which two things should be verified by the administrator to troubleshoot this issue? (Choose two.)
Which two things should be verified by the administrator to troubleshoot this issue? (Choose two.)
Question 78
Which three backup applications are supported by the PowerProtect DD VTL? (Select 3)
Question 79
Refer to the exhibit.

To which shelf and port should SAS HBA slot 1 port B be connected?

To which shelf and port should SAS HBA slot 1 port B be connected?
Question 80
A backup administrator is tasked with monitoring PowerProtect DD capacity metrics. The administrator is backing up 2 TB of data daily with a reduction rate at 5x. After data reduction, subsequent full backups compress down to 100 GB.
The initial backup requires 400 GB with a 10 percent increase in the data each day. Each incremental backup is 200 GB. After data reduction, each incremental backup is 20 GB.
What is the weekly burn rate (GB) after four daily incremental backups and one weekly backup?
The initial backup requires 400 GB with a 10 percent increase in the data each day. Each incremental backup is 200 GB. After data reduction, each incremental backup is 20 GB.
What is the weekly burn rate (GB) after four daily incremental backups and one weekly backup?