Question 36

While servicing an MX7000 chassis a system administrator logs into OME-M and receives a Chassis Mismatch error.
What should be the next step taken by the administrator?
  • Question 37

    During the installation of a PowerEdge MX7000, the implementation engineer notices the PSU health indicator stay on for one second, blink five times, then shut off.
    What is the issue?
  • Question 38

    A system administrator must obtain the correct rail and cable management to install a newly purchased MX7000 chassis into a rack.
    What type of rail and cable management is supported?
  • Question 39

    What is a valid option when resetting iDRAC to factory defaults?
  • Question 40

    A server administrator is deploying a VMware vSphere cluster and configuring High Availability on a PowerEdge MX7000 modular system.
    Which configuration is required?