Question 1

A workstation is being configured on the management VLAN (10.150.140.0/24) to connect to VxRail Manager for first time deployment.
Configuring which two IP addresses on the workstation will result in a successful deployment without having to change them during initialization?

Question 2

What is the maximum number of supported nodes in a VxRail Stretch Cluster?

Question 3

A VxRail cluster is being installed with Dell ToR switches at a "dark site." The administrator is not able to use the NVT tool.
Which command can they run on the ToR to verify VLANs are created, active, and properly configured on the uplink ports?

Question 4

What is validated by running the Proactive Network Performance test in vCenter on a VxRail cluster?

Question 5

An implementation engineer is deploying a new VxRail cluster What should they confirm before installing the hardware?