Question 11

How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:
  • Question 12

    ICNV initialization does 3
  • Question 13

    Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?
  • Question 14

    What do you do to prepare the database migration option of a SUM procedure?
    There are 3 correct answers
    Response:
  • Question 15

    You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.