Question 1
When performing an install on a FlashArray, what step should be taken first?
Question 2
What is the minimum AC voltage required to operate a FlashArray//X20R4 array?
Question 3
If a Technical Support Engineer (TSE) is not available to perform health checks after an installation, what action should the Implementation Engineer take?
Question 4
When executing a FlashArray upgrade from the FA-405 to a FA-X Series, into which slot on CT1 must the 2 Port InfiniBand Card be installed?
Question 5
Before installing array rails, where should the cage nuts be placed?