Question 41

The EPO status interface of the UPS5000-E can select a normally open or normally closed interface according to actual use.
  • Question 42

    The reason for using the EPO status interface in the parallel step of the UPS5000-E is ().
  • Question 43

    Before battery installation, the open circuit of full capacity should be check.
  • Question 44

    When the battery is out of control, what is the main cause of deformation and bulging due to the internal pressure becomes larger?
  • Question 45

    If the customer load cannot be de-energized, pay attention to ( ) when disconnecting the maintenance bypass switch after the repair is completed.