Question 76

The goal of video networking construction is to cover the entire domain, be available all the time, share the entire network, and be controllable throughout the entire process.
  • Question 77

    When the application of IVS3800 is redeployed, the ESN of the server will change, but the license does not need to be re-applied.
  • Question 78

    What are the equipment upgrade operations? (Multiple choice)
  • Question 79

    Which statement about electronic shutter is correct?
  • Question 80

    IVS3800 multi-level and multi-domain scenarios, management and service switches need to be stacked in groups, and IVS3800 single-domain scenarios, without group stacking.