Question 6

A company plans to upgrade the disaster recovery system, which requires the overall disaster recovery capability to meet the international standard SHARE7 8 Tier 7. The IT department takes the input-output ratio into consideration when planning and designing. The active and standby disaster recovery plan is selected.
  • Question 7

    A company purchased two sets of Huawei all-flash storage devices, and configured their active- active quorum policy as quorum server mode. When the quorum server fails, which of the following options are incorrect? (Multiple Choice)
  • Question 8

    Which of the following statements about the reliability of Huawei's OceanStor Pacific series storage system architecture are correct? (Multiple Choice)
  • Question 9

    An enterprise plans to build three centers in two places on the cloud on HUAWEI CLOUD. The customer requires cross-regional disaster recovery to avoid business interruption. Due to the particularity of the business, the customer requires disaster recovery RPO=0. The technicians provided the customer with SDRS (Storage Disaster Recovery Service) + CBR (Cloud Backup and Recovery) solution of three center Y were built in Availability Zones 1 and 2 of region A, and the construction of region B. The remote disaster recovery center Z, X, and Z data centers can meet the customer's RPO=O disaster recovery requirements. 1. When all BBUs of the storage controller are damaged, the controller will automatically set the I/O write policy to write-through and lock to ensure data reliability. It cannot be forced to write-back before the fault is recovered.
  • Question 10

    Storage engineer A often receives feedback from users that the read and write speed of business applications running on the storage is slow, and there is a phenomenon of lag. Engineer A logs in to the storage to check and finds that there is no front-end service port alarm, and replies to the user that the storage performance is normal.