Question 51

What are the ping-pong switching problem analysis indicators? (Multiple Choice)
  • Question 52

    Which of the following is not a key concern for PCI planning?
  • Question 53

    What basic information does the performance measurement task contain?
  • Question 54

    Regarding the demodulation reference signal, which of the following statements are correct? (multiple choice)
  • Question 55

    If the cell selection minimum set access level set by the base station side is -120dBm, the minimum access level value is offset to 0dB, the maximum allowable transmit power of the UE is 24dBm, and the maximum transmit power of the terminal is 23dBm, regardless of RSRQ, then the terminal signal the strength should be greater than -115dBm to camp on the cell.