Question 16

Your customer plans to add four HPE Synergy frames to an existing management ring Ail installed frames are equipped with two 2-port FLM modules, while new frames will be equipped with 4-port FLM modules.
Which statement about mixing different FLM modules is true?
  • Question 17

    Your customer has me following HPE Synergy setup
    - Three frames fully populated with HPE Synergy 480 Gen10 Plus modules and 25Gb/s downlink speed formulating a single logical enclosure
    - Two HPE Virtual Connect SE 100Gb F32 Module for Synergy
    - Four HPE Synergy 50Gb interconnect Link Module
    - Six HPE Synergy Virtual Connect SE 32Gb FC Modules
    The customer needs to add a frame.
    Which statement about the expansion of this setup is true?
  • Question 18

    You modified a logical interconnect group mat is used to configure logical interconnects in five different logical enclosures. What will be the impact of that change?
  • Question 19

    Which statement about a new HPE SimpliVity deployment is true?
  • Question 20

    Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use Distributed Switches and DRS cluster You are preparing a proposal with the following components:
    - HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
    - two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
    - an appropriate number of the vSphere Standard licenses for each compute node
    - one HPE D3940 Storage Modules with 40 SSDs - all required cables and options Which statement about this proposal is true?