Question 26
A solution integrator is installing new data center components including an HPE G2 Advanced Rack with two Standard Series G2 PDUs A customer observing the installation process questions whether there will be sufficient power for additional equipment that may be added in the future.
How should the solution integrator respond'?
How should the solution integrator respond'?
Question 27
A customer is considering an HPE ProLiant DL380 Gen10 server for their data center. The customer runs a large Oracle database. They need to increase performance and reduce their licensing costs.
Which feature of HPE Gen10 servers offers these benefits?
Which feature of HPE Gen10 servers offers these benefits?
Question 28
Refer to the exhibit.

A customer purchased a server/storage environment shown in the exhibit with 1 Gb networking connectivity.
The customer is now experiencing performance issues.
Identify the correct components to upgade the network connections and improve performance on the left. Then drag those components to the answer area on the right. (Choose three.)


A customer purchased a server/storage environment shown in the exhibit with 1 Gb networking connectivity.
The customer is now experiencing performance issues.
Identify the correct components to upgade the network connections and improve performance on the left. Then drag those components to the answer area on the right. (Choose three.)

Question 29
You are troubleshooting a customer's HPE ProLiant rack-mount server. The customer has configured the server in Legacy Boot BIOS Mode and is trying to boot from a USB 3.0 drive. The server will not boot from the drive.
What should you do?
What should you do?
Question 30
Refer to the exhibit.

You are configuring a pair of HPE 5945 switches into an IRF stack You have cabled the switches as depicted in the exhibit Into which IRF Ports should you place each switch interface?
A)

B)

C)

D)


You are configuring a pair of HPE 5945 switches into an IRF stack You have cabled the switches as depicted in the exhibit Into which IRF Ports should you place each switch interface?
A)

B)

C)

D)
