Question 11
Refer to the exhibit.

The exhibit shows the current plan for a wired network upgrade.
As much as possible, the customer wants to flatten the architecture and avoid recabling. However, each Building 2 switch must also maintain connectivity to the core if one link fails. What should the architect propose to meet the customer requirements?

The exhibit shows the current plan for a wired network upgrade.
As much as possible, the customer wants to flatten the architecture and avoid recabling. However, each Building 2 switch must also maintain connectivity to the core if one link fails. What should the architect propose to meet the customer requirements?
Question 12
A customer needs a networking solution that supports their Microsoft Skype for Business Unified
Communications (UC) solution. The architect discovers that user wireless devices are Wi-Fi Multimedia
(WMM) capable. Windows policies assign voice traffic DSCP 46 and video traffic DSCP 34.
Which potential issue should the architect explain to the customer about the default QoS settings?
Communications (UC) solution. The architect discovers that user wireless devices are Wi-Fi Multimedia
(WMM) capable. Windows policies assign voice traffic DSCP 46 and video traffic DSCP 34.
Which potential issue should the architect explain to the customer about the default QoS settings?
Question 13
An Aruba wireless solution for a very high density (VHD) wireless solution consists of a Mobility Master (MM) and two Mobility Controllers (MCs). What is the best practice design for routing the wireless traffic?
Question 14
Refer to the exhibit.

A customer needs to upgrade the wireless network at their campus, which has a single large building. Employees use the wireless network to access the Internet and centralized services. The building has four floors.
These are the requirements:
* 30 APs on each floor
* A Mobility Master (MM)-based architecture
* Deployment of one Aruba 7030 Mobility Controller (MC) on each floor, with the MCs combined in a cluster for seamless client failover and roaming What should the architect explain to the customer about the proposed solution?

A customer needs to upgrade the wireless network at their campus, which has a single large building. Employees use the wireless network to access the Internet and centralized services. The building has four floors.
These are the requirements:
* 30 APs on each floor
* A Mobility Master (MM)-based architecture
* Deployment of one Aruba 7030 Mobility Controller (MC) on each floor, with the MCs combined in a cluster for seamless client failover and roaming What should the architect explain to the customer about the proposed solution?
Question 15
An architect needs to choose between an Aruba Mobility Controller (MC) 7010 or 7024. Which сcustomer need indicates that the 7024 is a better choice than the 7010?