Online Access Free ISO-14001-Lead-Auditor Practice Test

Exam Code:ISO-14001-Lead-Auditor
Exam Name:PECB Certified EMS ISO 14001 Lead Auditor Exam
Certification Provider:PECB
Free Question Number:42
Posted:Jan 03, 2026
Rating
100%

Question 1

You are auditing the ISO 14001 management system of a primary school (School 21st Century) located in downtown Lima, Peru. There are 400 students, attending classes from 9 am until 5.30 pm.
You have presented a nonconformity at the closing meeting:
Non-conformity - No environmental aspect has been identified related to the impact of the education provided by the school on students' awareness (as future adults) related to generic environmental issues.
Select the three best acceptable corrections that the school may take.

Question 2

A management system meeting ISO 14001:2015 requirements is based on the Plan-Do-Check-Act (PDCA) cycle.
Which two elements of the management system are part of the 'Check' stage of the PDCA cycle?

Question 3

XM, a chain of 25 petrol stations, established an EMS following the requirements of ISO 14001, which was third-party certified 10 years ago. You are performing an internal audit before the fourth certification cycle.
During the audit to the EMS Manager (EM), the following dialogue takes place:
You: Could you please give me some details on the inspection of underground tanks in each station?
EM: It's very simple. There is a regulation that requires an annual leak inspection.
You: Who performs these inspections?
EM: I personally contract the inspectors and submit the results to the local authority. These are the certificates submitted last year.
You: I see only 22 certificates. There are three missing.
EM: The tanks of those three stations will be removed next year and replaced by new ones. I phoned the local authority and they told me that I do not need to send any report of the tanks that will be changed.
Which one of the following would be your next question?

Question 4

An oil organisation has a natural gas treatment plant on land crossed by several small rivers. On one particular day, after heavy rainfall for 48 hours, some of those rivers burst their banks and flooded the water treatment facilities of the plant. The oil-contaminated water reached some scarcely populated areas nearby.
Soon after, an internal audit was carried out to particularly analyse this event that was considered a nonconformity. There were no records of such heavy rainfall in the past 200 years.
Which three of the following actions are 'corrections'?

Question 5

Whistlekleen is a national dry cleaning and laundry organisation with 50 shops. You are conducting an EMS surveillance audit of Head Office and are sampling environmental performance measurement. You find that
80 per cent of failures to meet performance criteria originate from five shops in the same region. Most of these failures relate to the release of volatile organic compounds (VOCs) that exceeds regulations. The Environmental Manager tells you that these are the oldest shops in the organisation. The cleaning equipment needs replacing but the organisation cannot afford it at the moment.
On raising the matter with senior management, you are told that there are plans to replace the equipment in these shops over the next five years.
Select two options that apply to how you should respond to the information given.

Add Comments

Your email address will not be published. Required fields are marked *

insert code
Type the characters from the picture.