Online Access Free ISO-IEC-42001-Lead-Auditor Practice Test
| Exam Code: | ISO-IEC-42001-Lead-Auditor |
| Exam Name: | ISO/IEC 42001:2023Artificial Intelligence Management System Lead Auditor Exam |
| Certification Provider: | PECB |
| Free Question Number: | 200 |
| Posted: | Jan 06, 2026 |
Was the involvement of Ms. Rebecca Hayes, the internal auditor, necessary for the audit at ImoAI? Refer to scenario 9.
Scenario 9: ImoAl, headquartered in California. USA, provides Al solutions for various industries such as finance, healthcare, retail, and manufacturing. Its clients include major financial institutions seeking Al powered fraud detection systems, healthcare providers leveraging Al for diagnostics and patient care, retailers optimizing supply chain management with Al forecasting, and manufacturers enhancing production efficiency through Al-driven automation.
ImoAl has recently undergone a certification audit to ensure that its artificial intelligence management system AIMS is in compliance with ISO/IEC 42001. During the audit, a major nonconformity related to data security protocols was identified, requiring urgent resolution.
ImoAl swiftly initiated corrective actions to address the
major nonconformity. The audit follow-up, in agreement with the auditee, was scheduled six weeks after the initial audit. As part of exploring alternatives to audit follow-up, the audit team leader chose to verify the effectiveness of the actions taken by the auditee by scheduling a specific visit to ImoAI's premises.
The follow-up audit involved a thorough evaluation of the effectiveness of these actions. The audit team leader thoroughly examined the corrections, corrective actions, and root cause analysis conducted by ImoAl to assess whether they adequately addressed the nonconformity identified during the initial audit.
In conjunction with the external audit follow-up, ImoAl engaged its internal auditing team to oversee the progress of corrective actions. The AIMS manager of ImoAl updated Ms. Rebecca Hayes, the internal auditor, on the status of corrections and corrective actions prompted by the nonconformity identified during the external audit. Subsequently, Ms. Hayes thoroughly reviewed these measures, analyzing the corrections, root causes, and effectiveness of the implemented actions.
Upon satisfactory validation of the action plans, ImoAl was recommended for certification.
Based on Scenario 6, which aspect of assigning roles and responsibilities to the audit team is incorrect?
Scenario 6: AfrinovAl, based in Nairobi, Kenya, develops Al tools to improve agriculture in Africa. The company uses Al to address challenges faced by African farmers, offering tools for analyzing satellite images to monitor crop health, predicting pest and disease outbreaks, and automating irrigation to use water more efficiently.
AfrinovAl has implemented an artificial intelligence management system AIMS based on ISO/IEC 42001, reflecting its commitment to ethical and effective management practices in its Al solutions.
AfrinovAl is undergoing a certification audit to obtain certification against ISO/IEC 42001. Samuel, an expert in Al technologies and management systems, is heading the audit team. Before initiating the audit process, Samuel reviewed and approved the audit plan, which served as a basis for the agreement between the certification body and the auditee.
During the stage 1 audit, the audit team focused on a detailed evaluation of AfrinovAI's documented information, critically assessing both their format and content.
Samuel held a meeting with his team to prepare for the stage 2 audit. During this meeting, responsibilities were allocated among team members, assigning specific processes, functions, sites, areas, or activities based on each auditor's expertise and the audit requirements. He also assigned auditing roles to technical experts to leverage their specialized knowledge in specific areas.
In the stage 2 audit, Samuel and his team held an opening meeting during which Samuel explained how the audit activities will be undertaken. AfrinovAI's also participated in the meeting. Afterward, the audit team conducted on-site activities to closely inspect the physical locations of the audited processes. The interviewed individuals from the auditee's personnel regarding the AIMS and observed some of the operations of the auditee. They also used sampling and technical verification to assess the implementation of Al-related controls, verify compliance with established procedures, and identify any gaps in adherence to the AIMS requirements. They skipped the review of documented information related to the AIMS since some documents had already been reviewed during the stage 1 audit. This comprehensive approach ensured a thorough evaluation of AfrinovAI's AIMS against the ISO/IEC 42001.
Scenario 6 (continued):
Scenario 6: HappilyAI is a pioneering enterprise dedicated to developing and deploying artificial intelligence Al solutions tailored to enhance customer service experiences across various industries. The company offers innovative products like virtual assistants, predictive analytics tools, and personalized customer interaction platforms. As part of its commitment to operational excellence and innovation, HappilyAI has implemented a robust Al management system AIMS to oversee its Al operations effectively. Currently. HappilyAI is undergoing a comprehensive audit process of its AIMS to evaluate its compliance with ISO/IEC 42001.
Under the leadership of Jess, the audit team began the audit process with meticulous planning and coordination, setting the groundwork for the extensive on-site activities of the stage 1 audit. This initial phase was marked by a comprehensive documentation review. The audit scope encompassed a critical review of HappilyAI's core departments, including Research and Development (R&D), Customer Service, and Data Security, aiming to assess the conformity of HappilyAI's AIMS to the requirements of ISO/IEC 42001.
Afterward, Jess and the team conducted a formal opening meeting with HappilyAI to introduce the audit team and outline the audit activities. The meeting set a collaborative tone for the subsequent phases, where the team engaged in information collection, executed audit tests, identified findings, and prepared draft nonconformity reports while maintaining a strict quality review process.
In gathering evidence, the audit team employed a sampling method, which involved dividing the population into homogeneous groups to ensure a comprehensive and representative data collection by drawing samples from each segment. Furthermore, the team employed observation to deepen their understanding of the Al management processes. They verified the availability of essential documentation, including Al-related policies, and evaluated the communication channels established for reporting incidents.
Additionally, they scrutinized specific monitoring tools designed to track the performance of data acquisition processes, ensuring these tools effectively identify and respond to errors or anomalies. However, a notable challenge emerged as the team encountered a lack of access to documented information that describes how tasks about AIMS are executed. In addition to this, the team identified a potential nonconformity within the Sales Department. They decided not to record this as a nonconformity in the audit report but only communicated it to the HappilyAI's representatives.
During the stage 2 audit, the certification body, in collaboration with HappilyAI, assigned the roles of technical experts within the audit team. Recognized for their specialized knowledge and expertise in artificial intelligence and its applications, these technical experts are tasked with the thorough assessment of the AIMS framework to ensure its alignment with industry standards and best practices, focusing on areas such as data ethics, algorithmic transparency, and Al system security.
Question:
Based on Scenario 6, the auditor did not include the potential nonconformity of the Sales Department in the audit report. Is this acceptable?
Which of the following does NOT represent the purpose of managing and maintaining audit program records?
Scenario 5:
Scenario 5: Aizoia, located in Washington, DC, has revolutionized data analytics, software development, and consulting by using advanced Al algorithms. Central to its success is an Al platform adept at deciphering complex datasets for enhanced insights. To ensure that its Al systems operate effectively and responsibly, Aizoia has established an artificial intelligence management system AIMS based on ISO/IEC 42001 and is now undergoing a certification audit to verify the AIMS's effectiveness and compliance with ISO/IEC 42001.
Robert, one of the certification body's full-time employees with extensive experience in auditing, was appointed as the audit team leader despite not receiving an official offer for the role. Understanding the critical importance of assembling an audit team with diverse skills and knowledge, the certification body selected competent individuals to form the audit team. The certification body appointed a team of seven members to conduct the audit after considering the specific conditions of the audit mission and the required competencies.
Initially, the certification body, in cooperation with Aizoia, defined the extent and boundaries of the audit, specifying the sites (whether physical or virtual), organizational units, and the activities for review. Once the scope, processes, methods, and team composition had been defined, the certification body provided the audit team leader with extensive information, including the audit objectives and documented details on the scope, processes, methods, and team compositions.
Additionally, the certification body shared contact details of the auditee, including locations, time frames, and the duration of the audit activities to be conducted. The team leader also received information needed for evaluating and addressing identified risks and opportunities for the achievement of the audit objectives.
Before starting the audit, Robert wrote an engagement letter, introducing himself to Aizoia and outlining plans for scheduling initial contact. The initial contact aimed to confirm the communication channels, establish the audit team's authority to conduct the audit, and summarize the audit's key aspects, such as objectives, scope, criteria, methods, and team composition. During this first meeting, Robert emphasized the need for access to essential information that would help to conduct the audit.
Moreover, audit logistics, such as scheduling, access, health and safety arrangements, observer attendance, and the need for guides or interpreters, were thoroughly planned. The meeting also addressed areas of interest or concern, preemptively resolving potential issues and finalizing any matters related to the audit team composition.
As the audit progressed, Robert recognized the complexity of Aizoia's operations, leading him to conclude that a review of its Al-related data governance practices was essential for compliance with ISO/IEC 42001.
He discussed this need with Aizoia's management, proposing an expanded audit scope. After careful consideration, they agreed to conduct a thorough review of the Al data governance practices, but there was no mutual decision to officially change the audit scope. Consequently. Robert decided to proceed with the audit based on the original scope, adhering to the initial audit plan, and documented the conversation and decision accordingly.
Based on the scenario above, answer the following question:
Question:
Robert did not receive an offer from the certification body prior to accepting the mandate. Is this acceptable?