Question 1
A company uses Dynamics 365 Supply Chain Management.
You need to implement inventory cycle counting.
Which counting methods should you use? To answer, drag the appropriate counting methods to the correct requirements. Each counting method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

You need to implement inventory cycle counting.
Which counting methods should you use? To answer, drag the appropriate counting methods to the correct requirements. Each counting method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Question 2
Case Study 3 - Adventure Works Cycles
Background
Adventure Works Cycles builds stock and custom mountain bikes and is headquartered in San Diego. It has the following assembly and warehouse locations:
Denver, Colorado, United States

San Diego, California, United States

Budapest, Hungary

Most manufacturing is outsourced, with each facility only assembling the bikes. Parts are stocked at all facilities and may be transferred between warehouses or legal entities. All of the parts are at standard cost.
Current environment. Organizational structure
The following diagram shows the structure of Adventure Works Cycles.
Each of the physical locations in the United States (US) is a warehouse.

Hungary assembles and distributes products to the rest of the European Union (EU).

The EU legal entity is expected to add additional warehouse locations.

All legal entities roll up to a financial consolidation company.


Current environment. Purchasing
Higher quality tires that are used in new orders have become popular. Due to the volume of

orders, the company wants to negotiate pricing with VendorC. The vendor agrees to a discounted price for 500 tires purchased within the next six months. Once the 500 tires have been purchased, the discount will be re-evaluated based on demand.
Once a purchase is approved, for audit purposes it cannot be changed.

Whenever possible, parts are purchased from vendors also within the EU. A purchase order

was placed for a bike seat manufacturer in Italy.
Parts for custom orders may not always be kept in stock and will need to be procured.

Current environment. Purchasing requisitions
The following flow chart depicts the purchase requisition process:

Requirements. Purchasing
Items for purchase requisitions are governed by each country. Each of the country-specific

products will be grouped together for selection.
Purchase orders must follow the requisition process.

All existing purchase orders for brakes must account for the change to VendorB.

Requirements. Inventory
Standard costs are based on purchase fluctuations within a single month.

Tires use floating zones due to limited warehouse space.

Requirements. Operations
Due to recent brake failures, Adventure Works Cycles plans to purchase brakes from VendorB instead of VendorA. Although the brakes from Vendor B will continue to use the same item number as the brakes from VendorA, the price is slightly higher from VendorB. Adventure Works Cycles will pay list price from VendorB. The order for VendorB needs approval and the usual approver for purchase requisitions is on vacation.
All brakes from VendorA that are in stock must be tested. The process for brake testing must be implemented for all inbound orders. Quality orders must be automatically created upon receipt of the first shipment against a purchase order only.
UserC needs to consolidate brake inventory after it has been cleared for sale.
Ordering of the new brakes order will incur an additional cost because it is a rush order.
Requirements. Custom orders
Custom orders are placed for items that do not exist in the item master.

Hungary does not process custom orders.

The United States does process custom paint orders. Most custom paint colors are special

order and require purchase requisitions.
Quotes must be obtained from a minimum of two suppliers per company policy and compared

for the shipping, costs, and other variables. Quotes will not be selected based on lowest price only.
Issues
A special order for 26 high-end tires is received. This item is no longer in stock from the current

vendor.
Goods have been received in stock, but the matching invoice has not yet been received at the

time of month close.
UserA needs to set up pricing for the items purchased from VendorC and ensure that

accounting validates the receipt and invoice against the agreement.
UserB needs to send out a request for quotation (RFQ) for custom paint. The vendor will be

selected based on pricing, volume discounts, and lead time.
You need to resolve the issue for UserC.
What should you do?
Background
Adventure Works Cycles builds stock and custom mountain bikes and is headquartered in San Diego. It has the following assembly and warehouse locations:
Denver, Colorado, United States

San Diego, California, United States

Budapest, Hungary

Most manufacturing is outsourced, with each facility only assembling the bikes. Parts are stocked at all facilities and may be transferred between warehouses or legal entities. All of the parts are at standard cost.
Current environment. Organizational structure
The following diagram shows the structure of Adventure Works Cycles.
Each of the physical locations in the United States (US) is a warehouse.

Hungary assembles and distributes products to the rest of the European Union (EU).

The EU legal entity is expected to add additional warehouse locations.

All legal entities roll up to a financial consolidation company.


Current environment. Purchasing
Higher quality tires that are used in new orders have become popular. Due to the volume of

orders, the company wants to negotiate pricing with VendorC. The vendor agrees to a discounted price for 500 tires purchased within the next six months. Once the 500 tires have been purchased, the discount will be re-evaluated based on demand.
Once a purchase is approved, for audit purposes it cannot be changed.

Whenever possible, parts are purchased from vendors also within the EU. A purchase order

was placed for a bike seat manufacturer in Italy.
Parts for custom orders may not always be kept in stock and will need to be procured.

Current environment. Purchasing requisitions
The following flow chart depicts the purchase requisition process:

Requirements. Purchasing
Items for purchase requisitions are governed by each country. Each of the country-specific

products will be grouped together for selection.
Purchase orders must follow the requisition process.

All existing purchase orders for brakes must account for the change to VendorB.

Requirements. Inventory
Standard costs are based on purchase fluctuations within a single month.

Tires use floating zones due to limited warehouse space.

Requirements. Operations
Due to recent brake failures, Adventure Works Cycles plans to purchase brakes from VendorB instead of VendorA. Although the brakes from Vendor B will continue to use the same item number as the brakes from VendorA, the price is slightly higher from VendorB. Adventure Works Cycles will pay list price from VendorB. The order for VendorB needs approval and the usual approver for purchase requisitions is on vacation.
All brakes from VendorA that are in stock must be tested. The process for brake testing must be implemented for all inbound orders. Quality orders must be automatically created upon receipt of the first shipment against a purchase order only.
UserC needs to consolidate brake inventory after it has been cleared for sale.
Ordering of the new brakes order will incur an additional cost because it is a rush order.
Requirements. Custom orders
Custom orders are placed for items that do not exist in the item master.

Hungary does not process custom orders.

The United States does process custom paint orders. Most custom paint colors are special

order and require purchase requisitions.
Quotes must be obtained from a minimum of two suppliers per company policy and compared

for the shipping, costs, and other variables. Quotes will not be selected based on lowest price only.
Issues
A special order for 26 high-end tires is received. This item is no longer in stock from the current

vendor.
Goods have been received in stock, but the matching invoice has not yet been received at the

time of month close.
UserA needs to set up pricing for the items purchased from VendorC and ensure that

accounting validates the receipt and invoice against the agreement.
UserB needs to send out a request for quotation (RFQ) for custom paint. The vendor will be

selected based on pricing, volume discounts, and lead time.
You need to resolve the issue for UserC.
What should you do?
Question 3
You need to configure the products for the requirements.
Which configuration should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Which configuration should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Question 4
A manufacturing company has implemented Dynamics 365 Supply Chain Management. The company relies on machinery and equipment for its operations. It has a diverse range of assets, including manufacturing equipment, vehicles, and tools.
The company wants to optimize its asset maintenance processes to minimize downtime and improve overall productivity. The company wants to implement both preventive and reactive maintenance strategies on the following scenarios:
* Changing the tires and oil on the maintenance vehicle fleet.
* Replacing a faulty component on a box maker.
You need to determine the functionality to use for each maintenance requirement.
Solution: Create a maintenance plan for the vehicle fleet and a maintenance round for the box maker.
Does the solution meet the goal?
The company wants to optimize its asset maintenance processes to minimize downtime and improve overall productivity. The company wants to implement both preventive and reactive maintenance strategies on the following scenarios:
* Changing the tires and oil on the maintenance vehicle fleet.
* Replacing a faulty component on a box maker.
You need to determine the functionality to use for each maintenance requirement.
Solution: Create a maintenance plan for the vehicle fleet and a maintenance round for the box maker.
Does the solution meet the goal?
Question 5
You need to configure the pricing for the white-labeled products.
Which system object should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Which system object should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.