Online Access Free MB-335 Practice Test

Exam Code:MB-335
Exam Name:Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert
Certification Provider:Microsoft
Free Question Number:234
Posted:May 30, 2026
Rating
100%

Question 1

You need to resolve the issue for UserF.
What should you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Question 2

A company sells chemicals that require special instructions for disposal and remediation due to toxicity regulatory requirements.
The company requires that when a sales order ' s packing slip is printed for a product that contains a toxic chemical, the instructions must also be printed for inclusion in the shipment.
You need to configure the system to meet the requirements.
Which configurations should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Question 3

Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.
The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor. IngredientA is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient You need to ensure that the system is set up to support the manufacturing process.
Solution: Create a formula version for each concentration level.
Does the solution meet the goal?

Question 4

You have a product that can be manufactured on two different production lines in the same warehouse. You create resources and then create individual input locations for the resources. You create two routes. Each route uses different resources.
Materials are staged for consumption in different locations based on the resources being utilized for production.
You need to set up the formula to consume the goods from the correct line-side location.
What should you do?

Question 5

A company produces energy-efficient LED lighting solutions. Production is dependent on primary and secondary resources.
The primary resource is skilled assembly workers responsible for assembling LED lighting fixtures. The workers can work on only one fixture at a time during production.
The secondary resource is automated LED soldering machines, which typically operate at a 50% load capacity. The machines can work on multiple LED lighting fixtures at the same time.
The company must optimize the allocation of resources to meet customer demands efficiently.
You need to configure the resources to meet the customer demand.
What should you do?

Add Comments

Your email address will not be published. Required fields are marked *

insert code
Type the characters from the picture.