Question 26

You need to configure the system for plastic operations.
Which two parts should be manually reported as finished? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
  • Question 27

    A company makes engine parts used in the automotive industry.
    They are in the process of retooling an existing manufacturing plant. They are looking to use Dynamics 365 for Finance and Operations to help support the Bill of Materials (BOM) product lifecycle for engineering version control.
    You must translate existing production processes into the proper elements. You need to create BOM lifecycle states to translate existing production processes into the proper elements.
    What type of BOM product lifecycle state should you create? To answer, select the appropriate BOM state in the answer area.

    Question 28

    You need to configure the two lift kit subassembly cost requirements for production.
    Which methods should you use? To answer, select the appropriate options in the answer area.
    NOTE: Each correct selection is worth one point.

    Question 29

    You need to meet the substitution requirements for User4 and User5.
    What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
    NOTE: Each correct selection is worth one point.

    Question 30

    A bicycle manufacturing company is implementing Dynamics 365 Supply Chain Management.
    The warehouse must pick and stage parts other than paint for bicycle assembly. Paint is at the production station.
    You need to configure the reservations for production.
    What should you configure? To answer, select the appropriate options in the answer area.
    NOTE: Each correct selection is worth one point.