Question 171

You are tasked with creating a network that will accomplish the following requirements Requirements:
1) The remote sales team must be able to connect to the corporate network
2) Each department must have ONLY two PCs and a server
3) Each department must be segmented from each other
4) The following VLANs have been designated:
a) VLAN 2- Finance
b) VLAN 12- Sales
c) VLAN 22- Human Resources (HR)
Complete the network by dragging the required objects into the diagram
INSTRUCTIONS: Objects can be used multiple times and not all placeholders need to be filled

Question 172

A network engineer is designing a new IDF in an old building. The engineer determines the equipment will fit in a two-post rack, and there is power available for this equipment. Which of the following would be the FIRST issue to remediate?
  • Question 173

    A network technician receives a call from a branch office about a problem with its wireless connectivity. The user states the office hosting a large meeting that includes some online training with local businesses. The guest users have all brought devices to connect to the guest network at the branch office. All users are connected to a single WAP and are reporting that connections dropping and network speeds are unusable. Which of the following is the MOST likely cause of this issue?
  • Question 174

    A technician is setting up a public guest network for visitors to access the Internet that must be separate from the corporate network.
    Which of the following are the BEST steps for the technician to take with minimum overhead configuration? (Choose two.)
  • Question 175

    A telecommunications provider has just deployed a new OC-12 circuit at a customer site. While the circuit showed no errors from the provider end to the customer's demarcation point, a network administrator is trying to determine the cause of dropped packets and errors on the circuit. Which of the following should the network administrator do to rule out any problems at Layer 1? (Choose two.)