Question 11

You are working as the only in-house NACE Level 2 Inspector in a shop setting when an independent 3 rd party NACE Level 3 Inspector, representing the owner, presents you with a copy of a Non Conformance Report (NCR) he has written for a NACE2/SSPC SP 10 centrifugal blast which you had previously approved.
Your FIRST preferred course of action is to:
  • Question 12

    The number of air turns in an enclosure can be affected by all of these EXCEPT
  • Question 13

    You should bulk store coatings containing isocyanates
  • Question 14

    Because a NACE Level 2 Inspector has been trained in specific destructive tests, it is up to the Inspector to decide if and when a destructive test is required.
  • Question 15

    When working with someone who is very concerned about Stability and maintaining adherence to the status-quo, the Inspector should try to: