Question 141
An existing Nutanix customer has several clusters in production and is adding a new cluster. The customer wants to create an AHV cluster that has already been racked and powered on remotely, with the factory image, using Prism Central.
Which step should the consultant take next?
Which step should the consultant take next?
Question 142
A consultant configures a Nutanix cluster and integrates the hosts into vCenter using VMware best practices.
The customer has requested that the Nutanix cluster only have a single datastore.
Upon configuring the cluster per the customer requirements, vCenter displays an alert regarding the heartbeat datastore. The consultant adds the das.ignoreInsufficientHbDatastore value = true rule. The container can be seen from each host, but the alert remains active.
What should the consultant do to resolve this issue?
The customer has requested that the Nutanix cluster only have a single datastore.
Upon configuring the cluster per the customer requirements, vCenter displays an alert regarding the heartbeat datastore. The consultant adds the das.ignoreInsufficientHbDatastore value = true rule. The container can be seen from each host, but the alert remains active.
What should the consultant do to resolve this issue?
Question 143
After deployment of a Nutanix cluster, a customer has requested to validate the peak performance of the cluster.
Which tool can a consultant use to satisfy this request?
Which tool can a consultant use to satisfy this request?
Question 144
A consultant finishes creating a new ESXi cluster. The consultant connects to the nodes via laptop and a personal flat switch. The host/CVM network is on VLAN 23. The customer has the native VLAN on the ToR switches set to 23.
The customer wants to use LACP. Before placing the nodes on the customer network, the consultant tags VLAN 23 for each host and CVM. The consultant connects the nodes to the customer network and finds that they are unreachable.
What is causing this issue?
The customer wants to use LACP. Before placing the nodes on the customer network, the consultant tags VLAN 23 for each host and CVM. The consultant connects the nodes to the customer network and finds that they are unreachable.
What is causing this issue?
Question 145
Anadministrator needs to evaluate if the existing configuration of Protection Domains meets the specified corporate recovery policy for SQL Data. The corporate policy requires that all SQL Servers be recoverable at the DR site within 30 minutes, and must result in a maximum of 60 minutes of data loss. SQL data must be required.
The protection domain is configured as follows:
* Application consistent snapshots are enabled
* The SQL server VMs are assigned to the Protection Domain as their own Consistency Group
* The Protection Domain schedule is configured as snapshots taken every 90 minutes from 7 am until 8 pm What must be changed to meet the required policy?
The protection domain is configured as follows:
* Application consistent snapshots are enabled
* The SQL server VMs are assigned to the Protection Domain as their own Consistency Group
* The Protection Domain schedule is configured as snapshots taken every 90 minutes from 7 am until 8 pm What must be changed to meet the required policy?