Question 121
A company needs to replicate their VMs to a remote site and must have an RPO of less than 1 hour.
When creating a protection domain, what should an administrator do to meet this requirement?
When creating a protection domain, what should an administrator do to meet this requirement?
Question 122
A consultant needs to review a customer's switch port configuration to identify any issues. Other customer requirements are as follows:
* Leverage LACP
* Native VLAN will not be used
* Use Multiple Upstream switches
* Use VLANs 20-25 and 30
* LACP Fallback has been Enabled
* vPC or MLAG has been configured
What must be included in a configuration in order to meet these requirements?
* Leverage LACP
* Native VLAN will not be used
* Use Multiple Upstream switches
* Use VLANs 20-25 and 30
* LACP Fallback has been Enabled
* vPC or MLAG has been configured
What must be included in a configuration in order to meet these requirements?
Question 123
What is the minimum number of nodes required for a Nutanix Cluster to support Replication Factor 3 (RF3) on a storage container?
Question 124
A customer is deploying Nutanix AHV clusters over hundreds of remote sites worldwide. Prism Central will be used to centrally manage all clusters. Customer security policy requires the use of MS Active Directory (AD).groups to authenticate all network devices.
Which method should be consultant use to meet the requirements?
Which method should be consultant use to meet the requirements?
Question 125
Asystems administrator needs to add more VMs to their Nutanix cluster.
Which two actions should the administrator perform to determine if the current cluster can accommodate the new VMs? (Choose two.)
Which two actions should the administrator perform to determine if the current cluster can accommodate the new VMs? (Choose two.)