Question 96

Refer to the exhibit.

An administrator logs in to Prism and sees the status shown in the exhibit within the Hardware Diagram section.
What should the administrator do?
  • Question 97

    A consultant needs to review a customer's switch port configuration to identify any issues. Other customer requirements are as follows:
    * Leverage LACP
    * Native VLAN will not be used
    * Use Multiple Upstream switches
    * Use VLANs 20-25 and 30
    * LACP Fallback has been Enabled
    * vPC or MLAG has been configured
    What must be included in a configuration in order to meet these requirements?
  • Question 98

    In which part of the Knowledge Transfer can the customer learn how to create, escalate, comment, and close cases?
  • Question 99

    An administrator is supporting a business critical environment and deploys metro availability to achieve a zero data loss configuration. The two clusters are connected by a 1GbE connection. A new workload is going to be deployed to this cluster. This workload requires a sustained 150MB/S of write throughput and 20MB/s of read throughput.
    Which change must be made to deploy the workload successfully on this cluster?
  • Question 100

    Refer to the exhibits.

    A consultant is trying to test port failover on the node shown in the first exhibit. A continuous ping test is performed to the host. The consultant shuts down one of the links, after which the host ping request times out.
    The consultant tries to troubleshoot the issue with the customer and sees the information shown in the second exhibit on their Cisco Switches:

    What is causing the issue?