Question 21

A consultant deploys a four-node VMware ESXi cluster and vCenter server. An HA/DRS cluster is configured for all four nodes. The customer deploys five new VMs on the cluster.
During the knowledge Transfer, a network cable on one node is removed to demonstrate HA and migration of the VMs to another host. In the HA/DRS cluster settings, the VM Restart Priority for all CVMs is set to Disabled. The customer observes warnings that the CVM on the ejected host is no longer powered on.
Which ESXi HA/DRS cluster setting is missing?
  • Question 22

    A consultant creates three storage containers (container-1, container-2, container-3). The customer requires that only container-1, which will be utilized as an NFS datastore, be presented to external hosts.
    However, users are able to mount all three containers.
    What is causing this problem?
  • Question 23

    After uploading a hypervisor ISO during the Foundation process, a consultant sees a message that the MD5 sum for the hypervisor is not found in the Whitelist file.
    Which step should the consultant take next to resolve this issue?
  • Question 24

    A customer has engaged a Nutanix consultant to deploy a cluster consisting of two NX-3460-G6 blocks. The consultant arrives at the customer site and fines the following:
    * One rack with a total of 5U available
    * Two ToR switches with 14 total available ports
    * Dual PDUs with six available sockets
    What will prevent the consultant from successfully installing the cluster?
  • Question 25

    A consultant runs the Foundation Applet and discovers all the nodes. The consultant wants to use the latest version of Foundation for imaging for support purposes and to cover the latest hardware and software hypervisor support.
    What should the consultant do to upgrade Foundation on a node?