Question 1

A systems engineer is creating a workload for a Sizer Scenario that requires Disaster Recovery (DR) resources with a Recovery Point Objective (RPO) of 6 hours. The "Protect VMs and other Entities" setting is set to Yes.
Async is selected for the RPO. Which two other options must be enabled to have Sizer create a DR cluster?
(Choose two)
  • Question 2

    An SE is performing workload discovery with an SMB prospect running SQL Server. The databases is less than 1 TB, but its performance and uptime are critical to the prospect's business operations. Sizer sugests using 1065S nodes.
    Which aspects of the NX-1065S-G5 would cause an SE to filter out that nodel from Sizer's Automatic configuration? (choose two.)
  • Question 3

    Oracle HCL for certified Joint Support with Nutanix has Oracle Linux and Oracle VM via iSCSI listed.
    What Nutanix feature is used by this certified Configuration.
  • Question 4

    Based on their current workload. a customer request the systems engineer to create a solution that does not exceed 80% CPU utilization when a node is placed in maintenance mode (N+0) When creating the Sizer Scenario in Automatic Mode, how can the systems engineer accomplish this?
  • Question 5

    Refer to the exhibit.

    Assuming a prospect is currently using Thick Provisioned virtual disk, at a minimum, which two tabs should be evaluated in an RVTools report to determine required resources for sizing? (Choose two.)