Question 1

Click the Exhibit button.

You are adding new DS224C shelves in a new stack to your cluster with FAS8060 controllers running ONTAP 9.7.
Referring to the exhibit, which two actions should be performed to the cluster before installing the new shelves? (Choose two.)
  • Question 2

    You are performing an automated upgrade of a 2-node cluster. Node-01 upgrades successfully. But during the node-02 upgrade, there is a power outage at the site. When power is restored and the nodes are booted, you receive this message: Warning: The Cluster is in a mixed version state. Update all of the nodes to the same version as soon as possible.
    In this scenario, which command provides information that will help you understand the problem?
  • Question 3

    Which statement regarding a node-management LIF is true?
  • Question 4

    An ONTAP cluster is installed at a secure site. The array has no access to the Internet but is managed 24/7 by onsite engineers. The customer requires that when hardware failures occur, the failures are reported to the NetApp Support team as quickly as possible.
    In this scenario, which two tasks should be performed during the project hand-off procedure to satisfy the customer's requirement? (Choose two.)
  • Question 5

    A 4-node cluster has connectivity for both block and file access. Nodes 1 and 3 are used for file access, and nodes 2 and 4 are used for block access. During routine maintenance, node 4 is switched off and the LIFs are migrated to other nodes. Upon investigation, you see that the LIFs that serve file traffic have moved to alternative ports.
    However, LIFs that serve the block have not migrated. In this scenario, what is happening?