After construction begins, an owner asks the architect to select a different roof material. The architect wants to manage the risk associated with this change.
A geotechnical report for a public project reveals a previously unknown condition and indicates that there is rock directly beneath the existing grade. The proposed building will now require a shallow foundation. The chosen location was the result of a three-year process evaluating multiple potential sites.
Which actions should the architect take next as a result of the geotechnical report results? Check the three that apply.
A principal architect is working with a school district on designing an 18,000-square-foot athletics training facility. During the DD phase, the principal notices that the firm's younger staff has produced equipment plans that do not coordinate with the electrical engineer's sheets.
How should the principal architect respond to the lack of coordination? Check the three that apply.
A new restaurant design must incorporate specific light fixtures to meet the franchise requirements. The owner conveys this to the architect, who must make sure that prospective bidders do not overlook specific fixtures.
Which method should the architect use during the construction documents phase?