Question 41
When specifying telecommunications outlet boxes, all of the following should be considered EXCEPT:
Question 42
You have determined that your underground cable design requires three maintenance holes (MHs). One is 4.3 m (14 ft), one is 6 m (20 ft), and one is 6.7 m (22 ft) in length. How many MH covers are required to serve these MHs?
Question 43
A main cross-connect to intermediate cross-connect may be an interbuilding or intrabuilding link.
Question 44
A large telecommunications facility, by most codes, must be designed with an EPO switch located at:
Question 45
Often associated with raised flooring, a(n) ________ may consist of copper straps taped to the concrete floor, or it may be the floor itself with the stringers that support the tiles acting as the bonding conductor across the gradient of the floor.