Question 11

A Production operator in your company is required to report production activities, such as completing or scrapping production units, by referencing a work definition without creating work orders.
Identify the manufacturing transaction that a production operator can perform for reporting such activities.
  • Question 12

    The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, has scheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.
    Which two reasons could cause this?
  • Question 13

    To reduce the subassembly stock with no impact on material planning of child components of the subassemblies stock, you need to modify the multilevel item structure of a product.
    Identify the action that meets this requirement.
  • Question 14

    A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed in the previous shift.
    Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution.
  • Question 15

    While creating an item in Product Information Management (PIM), the following two item templates are selected in sequence and applied.
    1. Template: Finished Goods (WIP = No, Customer Ordered = Yes)
    2. Template: Sub-assembly (WIP = Yes, Customer Ordered = No)
    Identify the Item Attribute values in the application.