Question 41

Refer to the exhibit. An engineer is designing a BGP solution for a client that peers with ISP1 for full Internet connectivity and with ISP2 for direct exchange of routes for several third parties. Which action, when implemented on the edge routers, enables the client network to reach the Internet through ISP1?
  • Question 42

    Which two activities should occur during an SE's demo process? (Choose two.)
  • Question 43

    A company's security policy requires that all connections between sites be encrypted in a manner that does not require maintenance of permanent tunnels. The sites are connected through a private MPLS-based service that uses a dynamically changing key and spoke-to-spoke communication. Which type of transport encryption must be used in this environment?
  • Question 44

    Refer to the exhibit.

    A network engineer must improve the current IS-IS environment. The Catalyst switch is equipped with dual supervisors. Each time a stateful switchover occurs, the network experiences unnecessary route recomputation. Which solution addresses this issue if the upstream router does not understand graceful restart messaging?
  • Question 45

    Which design consideration must be made when dual WAN Edge routers are deployed at a branch site?